SPEED TO POWER

Fast, independent power for data centers 
and critical infrastructure.
From on-site generation to carbon capture and SMR transition, Next Century Power helps facilities move faster without losing sight of long-term energy goals.

What we do

Dedicated, independent, on-site power, built for speed and stability

We develop and operate on-site generation for large data centers, initially large-scale gas turbine installations (1GW+) in an islanded microgrid configuration, designed for high availability, redundancy and growth. Longer-term, we transition sites to our core product: a 1.2GW pod system consisting of four integrated 300MW SMRs, for durable, cost-stable power.

HOW WE’RE ADVANCING

In active dialogue with federal, state, and community stakeholders on data-center power needs

Coordinating with natural gas providers and municipalities on expedited power timelines

Engaged with defense and mission-critical installations

Partnering with technology providers

Our sites feature on site water treatment and disposal capabilities along with noise reduction measures.

We establish an annual community investment fund for all projects.

YOUR POWER EVOLUTION, SIMPLIFIED

1

Lock in the data center requirement

2

Build on-site generation

3

Capture carbon
emissions

4

Transition to
SMRs over time

CARBON CAPTURE TECH

Our capture pathway collects emissions for later processing of high-value 2D materials, an advantage that supports corporate carbon neutrality goals without slowing the race to power.

Industry Insights

Perspectives, technology updates, and market developments shaping the future of energy.
Morgan Stanley published research this month estimating U.S. data center power demand will rise from 9.19 gigawatts in 2025 to 78.57 gigawatts by 2029.
Quantum Computing

Sep 30, 2026

Most of the conversation about data centers in 2026 has been about what they take: water, power, grid capacity, community patience.
Industry Insights

Sep 21, 2026

In June, OpenAI disclosed that it had disrupted two Chinese-linked networks that were using ChatGPT to generate anti-data center content.
Quantum Computing

Sep 15, 2026

Dedicated, Single-Tenant Power

Single-tenant focus per site for tighter control and uptime

Built-In Redundancy & Reliability

Advanced redundancy: our designs incorporate a stranded-asset redundancy model with a RAM (Reliability, Availability, Maintainability) analysis targeting four nines (99.99% uptime). Our architecture includes on-site diesel-based generators for seamless failover, ensuring continuous power delivery.

Long-Term Contract Stability

Contract structures targeting longer horizons than traditional utility terms (10+ years)

Secure, Quiet & Durable

Cyber-physical security, quality construction and noise abatement built in